Three construction projects in Russia: two airport terminals and a metro line. Each case shows the problem, how the team used XR Blueprint and the result.
Case studies
Mineralnye Vody airport terminal
Domestic terminal, Russia. 28,000 m², 2023–2025, 11 QC inspectors, 3 contractors.
Read the case studyRoshchino airport terminal
Terminal reconstruction, Tyumen, Russia. 45,000 m², 2023–2027, 16 QC inspectors, 10 contractors.
Read the case studySamara metro, Phase I
Metro construction, Russia. 12,000 m², 3 metro sections, 28 specialists involved.
Read the case study