Terminal reconstruction, Roshchino Airport, Tyumen
The terminal is rebuilt in three stages while flights continue. All parties work from one digital record.

- Client
- Spektrum Group, technical customer
- Project
- Terminal reconstruction, Roshchino Airport, Tyumen, Russia, in three stages without stopping flights
- Project facts
- 45,000 m², 2023–2027, 16 QC inspectors, 10 contractors
- Product
- XR Blueprint
Case study
Challenge
The work takes place in an operating airport. The safety and quality rules are strict. All parties must document their work fast.
How XR Blueprint was used
All parties use one digital record. The team sets up the reports for each department. It creates tasks on the drawings and tasks that are not tied to a drawing.
Results
The parties work from one record and not from separate lists. Each department receives its own reports.