Book a demo

Case study

Terminal reconstruction, Roshchino Airport, Tyumen

The terminal is rebuilt in three stages while flights continue. All parties work from one digital record.

The hall of the airport terminal with a high ceiling, a skylight, escalators and a wall panel with a pattern of connected white dots.
Client
Spektrum Group, technical customer
Project
Terminal reconstruction, Roshchino Airport, Tyumen, Russia, in three stages without stopping flights
Project facts
45,000 m², 2023–2027, 16 QC inspectors, 10 contractors
Product
XR Blueprint

Case study

  • Challenge

    The work takes place in an operating airport. The safety and quality rules are strict. All parties must document their work fast.

  • How XR Blueprint was used

    All parties use one digital record. The team sets up the reports for each department. It creates tasks on the drawings and tasks that are not tied to a drawing.

  • Results

    The parties work from one record and not from separate lists. Each department receives its own reports.

See XR Blueprint on your project

Book a demoStart free trial