Book a demo

For contractors

Know which snags are yours and close them with proof

Snags arrive as photos in chat threads, with no place on the drawing. XR Blueprint puts each snag on the plan and assigns it to you.

What you get

  1. 01

    One list of your snags

    Each snag shows its place on the plan, its priority and its deadline.

  2. 02

    Fewer repeat visits

    The photo, the video and the voice comment show you the defect before you travel to site.

  3. 03

    Proof of the fix

    Close a snag with a photo. The inspector and the client see the record.

How you work in XR Blueprint

  • Snags on plans

    Open the plan and see where each defect is. Each pin shows the status and the priority.

    XR Blueprint project plan of a first floor, with coloured pins that mark snags on the drawing.
  • Assignment to your company

    The assigning user gives each snag a responsible contractor and a deadline. Up to 100 subcontractors and observers free per assigning user.

    XR Blueprint snag page with a description, a photo, a voice comment, a priority, a status and a deadline.
  • Checklists

    Work through the checklist for your scope and tick each item on site.

    XR Blueprint checklist for a lighting installation check, with a progress bar and ticked, failed and open items.
  • Inspection reports

    Export an inspection report to share with the team and keep as the record.

  • Action log

    Read who changed a snag and when.

Case study

Mineralnye Vody airport terminal

Project facts
28,000 m², 2023–2025, 11 QC inspectors, 3 contractors
Client
Spektrum Group, technical customer

The domestic terminal of Mineralnye Vody International Airport, Russia. The contractors and the quality control inspectors worked to one standard.

Read the case study

Related products

See XR Blueprint on your project

Book a demoStart free trial