Book a demo

Case study

Domestic terminal, Mineralnye Vody International Airport

The client had to hand over the terminal in stages on a tight schedule. All contractors worked in one app, to one standard.

Three engineers in safety vests and helmets walk along the glass facade of the airport terminal under construction.
Client
Spektrum Group, technical customer
Project
Domestic terminal, Mineralnye Vody International Airport, Russia
Project facts
28,000 m², 2023–2025, 11 QC inspectors, 3 contractors
Product
XR Blueprint

Case study

  • Challenge

    The terminal has a complex structure. The deadlines for the handover of each stage were tight. The team made its reports by hand.

    Steel frame of the terminal facade seen from below, with the roof structure behind it.
  • How XR Blueprint was used

    Engineers worked on site on mobile devices. The client put its own checklists in the app. Dashboards showed the state of the work. All contractors followed one standard.

    An engineer in a safety vest and helmet walks towards the airport terminal across the apron.
  • Results

    Each contractor recorded the work in the same way. The client's own checklists and the dashboards were in the app. The client followed each stage on a dashboard.

    Close view of the angled glass panels of the terminal facade against the sky.

See XR Blueprint on your project

Book a demoStart free trial