Book a demo

Case study

Phase I of the Samara metro, Russia

Engineers logged snags on site in real time. The app sent automatic notifications.

A worker in a safety vest and helmet stands in a concrete metro station hall under construction, with a flight of stairs ahead.
Project
Phase I of the Samara metro, Russia, in three sections
Project facts
12,000 m², 3 metro sections, 28 specialists involved
Product
XR Blueprint

Case study

  • Challenge

    Defects reached all parties slowly. The project had no central record of snags.

    A long concrete metro tunnel under construction, with black cable supports fixed to the wall.
  • How XR Blueprint was used

    Engineers and managers used mobile devices. They logged snags on site in real time. The app sent notifications automatically.

    An open excavation for a metro shaft, with large steel struts across the top and a tunnel opening at the far end.
  • Results

    The app sent automatic notifications for each new snag. The three sections shared one central record of snags.

See XR Blueprint on your project

Book a demoStart free trial